M/s Universal AssociatesEngineers & ContractorsA Class Govt. Contractor, Uttarakhand, P.W.D., Irrigation

Since 1998 · Hill Roads · Bridges · Slope Protection

We build roads & bridges through the mountains.

1998

Established

20

Govt. Road & Bridge Works

5

Steel Girder Bridges

48 m

Longest Bridge Span

Built for the hills

Building in the hills is different. Steep slopes, fast rivers and heavy monsoons decide how a road or bridge has to be built, and our team has been doing exactly that since 1998, from first survey to final handover.

More About Us
Steel truss bridge steelwork on site

What we do

Roads and bridges, built for the hills.

From the first cut into the slope to the last coat of blacktop, every job is engineered for steep terrain, rivers and monsoon rains.

  • 01

    Hill Road Construction

    New roads, widening and hairpin bends cut into steep slopes, with proper camber, side drains, crash barriers and a lasting blacktop.

    Enquire
  • 02

    Bridges & Culverts

    RCC, steel truss and girder bridges, causeways and culverts across rivers, streams and ravines, designed for flash floods.

    Enquire
  • 03

    Retaining Walls & Slope Protection

    Breast walls, retaining walls, gabions and landslide restoration that keep hill roads open through every monsoon.

    Enquire
  • 04

    Drainage & Road Maintenance

    Catch-water drains, scuppers, resurfacing and repairs, plus quick response when slides or washouts block a road.

    Enquire

Track record

Proven on Garhwal's toughest terrain.

20 government road and bridge works across Chamoli, Rudraprayag and Tehri Garhwal, for PMGSY Uttarakhand, Uttarakhand PWD, World Bank-funded UDRP.

  • A-Class Govt. Contractor
  • Uttarakhand PWD & Irrigation

Our steel girder bridges, to scale

Scroll sideways on mobile →

18 mHinsiriyakhal–GujethaTehri18 mTakoli–Bagadwal DharTehri24 mJagasu–Ransi TalsariRudraprayag30 mSimli Sankot, km 1Chamoli48 mSimli Sankot, km 4Chamoli
  • Hill road

    Narayanbagar–Kaub Motor Road

    Chamoli · World Bank (UDRP)

  • Steel bridge

    Steel girder bridge, km 4, Simli Sankot Motor Road

    Chamoli · PMGSY · 48 m span

  • Hill road

    Gullar Nai to Mindath Motor Road

    Tehri Garhwal · PMGSY · km 1.00 – 35.72

  • Hill road

    Jakholi Guptkashi Basti to Hat Motor Road, Stage I

    Rudraprayag · PMGSY · Construction & maintenance

See all 20 works & certificates

Selected projects

Keeping the hills connected.

Selected hill road, bridge and slope-protection works across Garhwal, delivered with careful planning and steady execution.

View All Projects
Representative photo

Hill Road · World Bank-funded

Narayanbagar–Kaub Motor Road

Hill-side cutting, retaining and breast walls, WBM base, premix carpet, causeways, culverts and road-safety signage. Completed ahead of the stipulated date.

  • › Chamoli
  • › 2015 – 2017
  • › Completed early
See track record
Representative photo

Bridge · PMGSY

48 m Steel Girder Bridge, Simli Sankot

The longest of our five steel girder bridges, at km 4 on the Simli Sankot Motor Road, for the PMGSY division at Karanprayag.

  • › Chamoli
  • › 48 m span
  • › Steel girder
See track record
Representative photo

Hill Road · PMGSY

Gullar Nai–Mindath Motor Road

Construction of the hill road from km 1.00 to 35.72, followed by a 17.47 km second stage and a link to Chameli.

  • › Tehri Garhwal
  • › km 1.00 – 35.72
  • › 3 stages
See track record

Our approach

Clear decisions.
Controlled execution.

In the hills, the season sets the deadline. Our process keeps clients informed while survey, design and site teams race the monsoon together.

  1. 01

    Survey

    Site visit, alignment, slope and soil checks, and where the water will flow in the rains.

  2. 02

    Design & Estimate

    Drawings, BOQ, material planning and a schedule that fits the working season.

  3. 03

    Build

    Cutting, walls, bridges and surfacing, with daily supervision and quality checks on site.

  4. 04

    Handover & Maintain

    Final inspection, documentation, and support when the monsoon tests the work.

Yellow gate of the M/S Universal Associates yard on Cheeni Godam Road, Gumaniwala, with the company name and phone numbers painted on it

Visit our yard

Find us at the yellow gate in Gumaniwala.

Our office, machinery and material yard have been on Cheeni Godam Road since 1998. Drop in to discuss a site, or call ahead and we'll be ready for you.

Address
Cheeni Godam Road, Gumaniwala, Rishikesh, Uttarakhand
Hours
Monday – Saturday, 9:00 AM – 6:00 PM
Get Directions

Start a conversation

Have a road or bridge to build in the hills?

Tell us about the site, the terrain and your timeline. Our team will visit, survey and suggest the right next step.